the library in the woods
boltiere (bg)
- Year
2016
- Client
comune di boltiere (bg)
- Cost
990.000 euro
- Status
3rd prize
- Team
LCA architetti
-
+ Description
The project for the new extension of the school in Boltiere has a single underlying theme: sustainability. This goal is pursued at both urban and architectural scale: full respect for green areas; an ecological corridor between the open land around the cemetery and the area around the sports ground; pedestrian routes to the school entrances; reorganised, rationalised parking; building materials from renewable sources (wood, steel and glass); bioclimatic strategies to control heat gains; low energy use; and limited use of reinforced concrete (avoiding a basement multi-purpose hall)… these are just some of the points considered at the concept stage. The traffic plan aims to rationalise and reduce car traffic (both volume and speed) along via Dante, improving and making safer the existing cycle path and the pedestrian routes to the historic centre and nearby parking areas. The basic measures are: traffic or speed limits on the short stretch of via Dante between via Garibaldi and Piazza IV Novembre, possibly with stone paving; a small square with trees and benches in front of the entrance to the new multi-purpose hall; and new and reorganised parking near the market area, the municipal gym and the town hall. This proposal can be further strengthened by planting medium-sized trees along the stretch of via Dante that leads from the west to the civic centre.
The town's main public buildings stand west of the historic core, with the school at their centre. The extension is set at right angles to the existing building, and its axis emphasises the north–south line along which the other important public buildings stand (municipal gym, civic centre, town hall). With its simple, elegant gabled front and welcoming entrance portal, the multi-purpose hall first, and then the library, open up to the community in a clearer, more coherent way, completing the series of public facilities that characterise Boltiere. These spaces can be used safely and independently by others for out-of-school activities (exhibitions, talks, council meetings, small shows…) without direct access to the teaching areas. Both rooms are also directly connected to the school atrium, so pupils can reach them straight from their classrooms. The school's main entrance is at the junction between the old and new buildings; to give it more importance and space, a large, bright shared atrium has been created, as requested by the brief. It can be reached from the south along a softer, natural path through the wooded garden, or from the west by those coming from the car parks or from that part of town. The competition design is the result of a careful analysis of the setting around the existing school. The high value of the trees (see the sheets attached to the brief) and of the green areas along the south front, and the wish to keep them intact, mean the extension can only be built on the paved area to the south, today the school's main entrance. Only within this paved area is the new building placed, with the school library and multi-purpose hall on the ground floor and the four classrooms required by the brief on the first floor. The two construction phases of the existing school created some evident disharmonies, made worse by projections and mismatched windows. To unify the whole and link the "old" building with the new extension, a structure of wooden slats has been added as a second skin; it both evens out the flaws of the earlier, poorly composed elevations and controls direct sunlight in the main classrooms in a bioclimatic way.
The structure also serves as a portico and a covered alternative route to the main entrance on rainy days; with its ramp, it provides easy access for people with disabilities. The play of light created by the slender timber posts marks the two levels of the south front of the existing building. This contrasts deliberately with the bare, simple volume of the extension, which instead has large windows on the ground floor and micaceous iron-grey metal cladding on the first floor. The library and the multi-purpose hall open boldly onto the green spaces to the east and west, heightening the pleasant feeling of working and studying in very close contact with nature. All the classrooms required by the brief are in the new building and can be used either as teaching or group-work rooms. The atrium of the old school has been reworked by removing some partitions, creating a staff room as well as a school office and administration area. Its walls are clad in wood panels, except for the large north-facing window that brings in plenty of indirect daylight. To the west, about 60 m² of teaching space has been added; the design also suggests a different arrangement of the classrooms to make better use of functions and floor areas. If needed, the school can be extended further in the future. The choice not to put the multi-purpose hall in a basement was driven by the wish to avoid large amounts of reinforced concrete, limit excavation and underpinning costs, enhance its public role by relating it clearly to the town, keep a direct relationship with nature and the trees around the school, allow independent use by all residents, and make it easily accessible to people with disabilities. The interior is designed to be flexible for the different uses the hall may host (theatre, council meetings, exhibitions…). Its closeness to the school library means the two rooms can be connected and combined when either needs more space.
Awards
2015 / design competition / 3rd prize
- projects
- competitions
-
-
the library in the woods
boltiere (bg)
- Year
2016
- Client
comune di boltiere (bg)
- Cost
990.000 euro
- Status
3rd prize
- Team
LCA architetti
-
+ Description
The project for the new extension of the school in Boltiere has a single underlying theme: sustainability. This goal is pursued at both urban and architectural scale: full respect for green areas; an ecological corridor between the open land around the cemetery and the area around the sports ground; pedestrian routes to the school entrances; reorganised, rationalised parking; building materials from renewable sources (wood, steel and glass); bioclimatic strategies to control heat gains; low energy use; and limited use of reinforced concrete (avoiding a basement multi-purpose hall)… these are just some of the points considered at the concept stage. The traffic plan aims to rationalise and reduce car traffic (both volume and speed) along via Dante, improving and making safer the existing cycle path and the pedestrian routes to the historic centre and nearby parking areas. The basic measures are: traffic or speed limits on the short stretch of via Dante between via Garibaldi and Piazza IV Novembre, possibly with stone paving; a small square with trees and benches in front of the entrance to the new multi-purpose hall; and new and reorganised parking near the market area, the municipal gym and the town hall. This proposal can be further strengthened by planting medium-sized trees along the stretch of via Dante that leads from the west to the civic centre.
The town's main public buildings stand west of the historic core, with the school at their centre. The extension is set at right angles to the existing building, and its axis emphasises the north–south line along which the other important public buildings stand (municipal gym, civic centre, town hall). With its simple, elegant gabled front and welcoming entrance portal, the multi-purpose hall first, and then the library, open up to the community in a clearer, more coherent way, completing the series of public facilities that characterise Boltiere. These spaces can be used safely and independently by others for out-of-school activities (exhibitions, talks, council meetings, small shows…) without direct access to the teaching areas. Both rooms are also directly connected to the school atrium, so pupils can reach them straight from their classrooms. The school's main entrance is at the junction between the old and new buildings; to give it more importance and space, a large, bright shared atrium has been created, as requested by the brief. It can be reached from the south along a softer, natural path through the wooded garden, or from the west by those coming from the car parks or from that part of town. The competition design is the result of a careful analysis of the setting around the existing school. The high value of the trees (see the sheets attached to the brief) and of the green areas along the south front, and the wish to keep them intact, mean the extension can only be built on the paved area to the south, today the school's main entrance. Only within this paved area is the new building placed, with the school library and multi-purpose hall on the ground floor and the four classrooms required by the brief on the first floor. The two construction phases of the existing school created some evident disharmonies, made worse by projections and mismatched windows. To unify the whole and link the "old" building with the new extension, a structure of wooden slats has been added as a second skin; it both evens out the flaws of the earlier, poorly composed elevations and controls direct sunlight in the main classrooms in a bioclimatic way.
The structure also serves as a portico and a covered alternative route to the main entrance on rainy days; with its ramp, it provides easy access for people with disabilities. The play of light created by the slender timber posts marks the two levels of the south front of the existing building. This contrasts deliberately with the bare, simple volume of the extension, which instead has large windows on the ground floor and micaceous iron-grey metal cladding on the first floor. The library and the multi-purpose hall open boldly onto the green spaces to the east and west, heightening the pleasant feeling of working and studying in very close contact with nature. All the classrooms required by the brief are in the new building and can be used either as teaching or group-work rooms. The atrium of the old school has been reworked by removing some partitions, creating a staff room as well as a school office and administration area. Its walls are clad in wood panels, except for the large north-facing window that brings in plenty of indirect daylight. To the west, about 60 m² of teaching space has been added; the design also suggests a different arrangement of the classrooms to make better use of functions and floor areas. If needed, the school can be extended further in the future. The choice not to put the multi-purpose hall in a basement was driven by the wish to avoid large amounts of reinforced concrete, limit excavation and underpinning costs, enhance its public role by relating it clearly to the town, keep a direct relationship with nature and the trees around the school, allow independent use by all residents, and make it easily accessible to people with disabilities. The interior is designed to be flexible for the different uses the hall may host (theatre, council meetings, exhibitions…). Its closeness to the school library means the two rooms can be connected and combined when either needs more space.
Awards
2015 / design competition / 3rd prize
-
- awards
- about us
- blog
- contact
- fun






